AABSOPRO
Self Adhesive Leather Repair Patch Strong Stickiness 3.1"x60" Leather Repair Tape PU Leather Gray 1 Pcs
Self Adhesive Leather Repair Patch Strong Stickiness 3.1"x60" Leather Repair Tape PU Leather Gray 1 Pcs
Couldn't load pickup availability
About This
- Fit for:Widely applied for cars, trucks, pickups, RVs, SUVs, marine, boats for automotive seat, sofa, couches, chair, armrest, door handle or panel and more interior trim repair. It does a good job in interior trim upholstery for aging broken faded DIY repair replacement.
- Product Information:Our automotive leather repair patch is soft, durable and comfortable to touch to be a good choice as the interior trim repairing material to give your car a new look.It's clean and not easy to be deformed, which can repair or protect the car interior. The self adhesive is strongly sticky so it will stick to the place firmly.
- Details:We offer different color and size. Please choose according to personal needs.
- How to use:You can measure the size and shape you need and cut it to fit. Then you can use the adhesive backing to fix it.
- Tip:There may be a little color difference due to lighting when taking photo.
Overview
- Brand : A ABSOPRO
- Color : Gray
- Material : PU Leather
- Size : 3.1" x 60"
- Manufacturer : A ABSOPRO
Share

Explore Our Collections
-
Caulking Tool
Whether you're sealing a bathroom, fixing window gaps, or finishing tile edges, having...
-
Sealant Remover Tool
Old, peeling sealant is more than an eyesore — it's an open...
-
Gap Repair
Even the smallest gap around your home can let in moisture, drafts,...
-
WATERPROOF
Water damage is one of the most expensive problems a homeowner can...
-
BATHROOM & KITCHEN
The bathroom and kitchen are the two hardest-working rooms in your home...
-
Leather Repair
Scratches, cracks, peeling surfaces, and worn edges can make leather furniture, car...
Customer Review
-
Daniel Brooks
⭐⭐⭐⭐⭐
"Saved me from an expensive plumbing repair"
I discovered a small leak under my kitchen sink late at night.
This repair tape was incredibly easy to apply and stopped the leak immediately.
It held securely until I could arrange a permanent repair.
A must-have item for every homeowner. -
Sophia Mitchell
⭐️⭐️⭐️⭐️⭐️
"Quick fix that actually works"
I used this waterproof repair tape on an outdoor water pipe.
The application took only a few minutes and the seal has remained strong through several rainstorms.
It's durable, reliable, and much easier than I expected.
I'm very impressed with the results. -
Ryan Cooper
⭐️⭐️⭐️⭐️⭐️
"Perfect for emergency repairs"
A pipe in my garage started leaking unexpectedly.
This tape gave me a fast temporary solution without needing special tools.
The adhesion is strong and the material feels high quality.
Definitely worth keeping in a home repair kit. -
Emma Sullivan
⭐⭐⭐⭐⭐
"Every DIY homeowner should have this"
I purchased this for emergency household repairs and it exceeded my expectations.
It sealed a leaking connection quickly and helped prevent further water damage.
The instructions were simple and the product worked exactly as advertised.
I'll be ordering another roll just to keep on hand.
Blogs
View all-
How to Repair Peeling Wood Veneer Without Repla...
Peeling wood veneer does not always mean furniture replacement is necessary. Identify the cause of lifting, choose an adhesive compatible with the veneer and substrate, and apply controlled pressure during...
How to Repair Peeling Wood Veneer Without Repla...
Peeling wood veneer does not always mean furniture replacement is necessary. Identify the cause of lifting, choose an adhesive compatible with the veneer and substrate, and apply controlled pressure during...
-
How to Repair Chipped Tile Edges Without Replac...
Chipped tile edges do not always require full tile replacement. Small chips can often be repaired by cleaning and drying the surface, removing loose fragments, and applying a tile-compatible repair...
How to Repair Chipped Tile Edges Without Replac...
Chipped tile edges do not always require full tile replacement. Small chips can often be repaired by cleaning and drying the surface, removing loose fragments, and applying a tile-compatible repair...
-
How to Repair Small Holes in Drywall Without Re...
Small drywall holes from nails, screws, and picture hooks can often be repaired without repainting an entire wall. Clean the damaged area, apply suitable spackle or drywall compound, let it...
How to Repair Small Holes in Drywall Without Re...
Small drywall holes from nails, screws, and picture hooks can often be repaired without repainting an entire wall. Clean the damaged area, apply suitable spackle or drywall compound, let it...
-
Why Do Small Scratches Make Wood Floors Look So...
Small scratches and scuff marks can make wood floors look worn even when the flooring remains structurally sound. The right repair depends on the material, the depth of the damage,...
Why Do Small Scratches Make Wood Floors Look So...
Small scratches and scuff marks can make wood floors look worn even when the flooring remains structurally sound. The right repair depends on the material, the depth of the damage,...